San Gabriel Valley Superfund site
QES served as oversight supervisor for US EPA Region IX and the RWQCB Los Angeles Region, observing subcontractor field activities at several operable unit areas. Activities included drilling, construction, development and sampling of monitoring wells up to 900 feet below ground surface, along with Westbay multiport monitoring systems.
Former Home Depot property, Thousand Oaks
As project manager, QES characterized subsurface conditions at a site where groundwater is impacted by chlorinated volatile organic compounds and petroleum hydrocarbons. Through upgradient off-site groundwater monitoring, QES showed the chlorinated compounds were likely from an upgradient off-site source and focused the remaining investigation on a hydrocarbon plume related to a former gasoline station. A geophysical survey identified a potential on-site source.
OII Landfill remedial investigation
As lead hydrogeologist for the final phase, QES reviewed hydrostratigraphic and water quality data from over 100 wells and borings to refine the conceptual model of a complex hydrologic system that includes structurally deformed and faulted water bearing units. The interpretation assessed groundwater and soil vapour migration pathways and evidence of potential impact to offsite receptors, supporting the risk assessment and feasibility study phases.
OII Landfill feasibility study
As lead hydrogeologist, QES developed design alternatives for leachate collection within the landfill, containment of leachate migrating outward from the perimeter, and remediation of contaminated groundwater offsite. Final alternatives included barrier walls and collection wells at the perimeter, with monitored natural attenuation or groundwater extraction in offsite regions.
Nine-criteria alternatives analysis
QES compared each alternative on technical efficiency, protection of human health and the environment, cost and other factors in accordance with the nine National Contingency Plan criteria, and presented the detailed analyses, conceptual alternative design plans and comparative results to US EPA and major potentially responsible parties.
PCE recycling facility, Port of Los Angeles
QES performed interim corrective action screening at a former perchloroethylene recycling facility. The RCRA Facility Assessment received commendation from the Department of Toxic Substances Control. Corrective action technologies evaluated for dense nonaqueous phase liquid and dissolved phase contaminants included six-phase soil heating, barrier wall containment, funnel and gate technology, soil vapour extraction, multi-phase extraction and monitored natural attenuation.